Sunday, May 26, 2013

Flip House - Week Six

This week was an existing to see the house start to come together and with an end in sight.  Some of the tasks crossed off the list during week 6 include:
- Filled up dumpster to clear out everything in the house
- Windows installed (by Pella)
- Demo'ed the basement garage entry door
- Contractor installed most of interior doors (holding off on the bathroom doors so we can finish the tile and still waiting on the delivery of the garage entry door)
- Mowed the lawn for the first time, cleaned-up some of the landscaping in the back
- Painted and installed the shutters- Installed our $30 craigslist mantel
- Finished painting ceilings in basement
- Primed walls
- Painted entire upstairs with the exception of the family room
- Painted fireplace
- Cabinets installed
- Scheduled carpet measurement
- Tiled floors in both bathrooms
- Hung house numbers
- Repaired garage door trim
- Cement patches in driveway, walkway, front-step




Sunday, May 19, 2013

Flip House - Week Five


  • Landscaping: We started tackling the crazy landscaping that the previous owner created.  We trimmed big pine tree and racked up the leaves, cleaned up most of the front planting beds, removed a planting bed along road, created boulder edging along front planting bed and about half of the time we were doing this in the rain.  I wish I would have got a picture of us.  Not only were we full of mud and soaking wet but Mike also managed to rip his jeans from the crotch to about his knee.  I am sure we were a sight to see.
  • Power-washed the exterior
  • Filled seams in exterior where windows were removed
  • Scheduled cabinet delivery
  • Scheduled granite measurement
  • Finished cleaning off any excess wall-paper glue on the master bedroom walls
  • Purchased additional painting supplies, tiles, and misc. items such as a door bell and closet door knobs
  • Contractor completed all of the drywall work including spraying texture on the ceilings
  • Painted entire upstairs ceilings and started the basement
  • Primed walls in kitchen and family room
  • Ordered our final dumpster
  • Finished priming the basement fireplace...this was another long process and there is a lot left to do.  A never-ending project like the closet doors.
FIREPLACE PROGRESS: Primed brick/hearth, removed brass surround - Next steps are to spray inside with black high-heat, secure hearth, and fill in any holes with mortar, then paint then paint the brick

Saturday, May 18, 2013

Emma's First Dental Check-up

Yesterday the kids both had dentist appointments which was Emma's very first trip to see Dr. Hank.  After a couple video games in the lobby Evan was up first.  He did great during his cleaning and check-up.  Emma seemed a little nervous but was very interested in what Evan was doing.  Soon it was Emma's turn to hop on the chair where she got to sit right next to her big brother.  She was a little afraid at first but warmed up quickly especially after she got to pick out a new princess toothbrush!  On the way to the appointment I asked them what color toothbrush they would pick.  Evan wanted green and he scored a green light-up one and Emma was able to get the color she wanted as well and snagged a pink Ariel toothbrush.  While Evan was getting his x-rays Emma was busy getting her teeth cleaned.




Overall both kids had good check-ups.  We talked about Emma's over-under bite...top teeth have a pretty big over-bite due to her thumb sucking and to make it worse the bottom teeth have an under-bite giving her a pretty big gap between here top and bottom pearly whites.  Dr. Hank said at her age there isn't much we can do to stop her from sucking her thumb but we will definitely address as she gets older and understands she needs to cut the habit.  She also has a small chip in her front tooth from a run-in with a sidewalk and we'll also just watch that to see if it is something that we should have fixed.  So for now we'll just continue to brush and floss, drop hints to stop sucking the thumb, and pray that her adult teeth will not take on the same structure as the baby ones.

Monday, May 13, 2013

Flip House - Week Four


Week 4 recap:

  • All preliminary inspections complete & passed
  • Drywall hung
  • Initial landscaping clean-up complete
  • Cleaned up and painted the heat registers and return grills
  • Removed shutters, will paint them black and only put them back on the upper windows
  • Caulked and painted exterior board-and-baton siding
  • Added insulation in basement ceiling
  • Finished painting existing window trim
  • Emptied out the utility room (washer & dryer, utility sink, pressure pump)
  • Continued to put a couple coats of paint on the existing bi-fold closet doors...this is taking forever!  Each side needs to be primed and then two coats of paint.  Hopefully will have this complete next week.
  • Cut out hardwood flooring in kitchen where tile will start
  • Marked all of the doors so the contractor knows which one goes whereChanged the dates for the kitchen appliance delivery due to the cabinets being delayed


Top - kitchen and family room - BEFORE
Bottom - Looking into the kitchen and family room - IN PROCESS
Left - Upper level bathroom- BEFORE
Right - Upper level bathroom - IN PROCESS

Tuesday, May 7, 2013

Kindergarten Round-Up


Tonight Evan and I visited his elementary school for a brief meeting followed by a chance to explore the school, meet the kindergarten-plus (K-Plus) teachers, and Evan's favorite...check out the playground. In most public school districts in Minnesota kindergarten is not full-day. However you can pay tuition to enroll your child in what they call Kindergarten-plus which essentially daycare+traditional kindergarten. Since all of the students need to be at the same level when they start 1st grade it isn't like the Kindergarten-plus kids extra instruction.  At least that is the way I see it.


All of the teachers seemed very nice but I have picked which one I would prefer for Evan but I am sure he will be fine with any of the three.  Evan is the most excited for recess!  He made sure to tell all of the teachers this.


Monday, May 6, 2013

Flip House - Week Three

Another week in the books completed at the house on Walnut.

This week we ran into a road-block with inspections.  We called, went to the city building department, and reviewed the guidelines online to determine what permits we needed.  Our contractors pulled permits for the electrical, plumbing, and the furnace replacement however when the plumbing inspector arrived he determined that we needed another permit and placed a stop work order on our door.  This set us back a couple days.  The city was very nice about everything and said that the work we are doing is really borderline in terms of needing additional permits.  Each room individually would not need another permit but when you look at the full scope of work in the house they said we needed a permit for the remodel.  This will also require a framing inspection and an insulation inspection as well.  We want to do everything by the book so we have no problem with this.  We should be good to go to start work Monday morning.  Even though our contractors didn't work Thursday and Friday we were still busy all week and weekend.
  • Plumbing and electrical inspections
  • Prepped the demo walls for new drywall (i.e. pull out all of the nails and screws left behind from the demo)
  • Primed the basement fireplace
  • Painted bi-fold closet doors
  • Sanded, primed, and painted existing windows trim
  • Put all of the doors back on jams (removed everything to paint last week)
  • Removed all of the thinset left on the basement bathroom floor and entry way
  • Purchased additional materials including the closet shelving
  • Had another dumpster bag picked up
  • Removed all existing hardware, shelves, rods, etc. in the closets
  • Accessed yard work needed and contacted a few companies for bids to do the initial yard clean-up