Sunday, May 26, 2013

Flip House - Week Six

This week was an existing to see the house start to come together and with an end in sight.  Some of the tasks crossed off the list during week 6 include:
- Filled up dumpster to clear out everything in the house
- Windows installed (by Pella)
- Demo'ed the basement garage entry door
- Contractor installed most of interior doors (holding off on the bathroom doors so we can finish the tile and still waiting on the delivery of the garage entry door)
- Mowed the lawn for the first time, cleaned-up some of the landscaping in the back
- Painted and installed the shutters- Installed our $30 craigslist mantel
- Finished painting ceilings in basement
- Primed walls
- Painted entire upstairs with the exception of the family room
- Painted fireplace
- Cabinets installed
- Scheduled carpet measurement
- Tiled floors in both bathrooms
- Hung house numbers
- Repaired garage door trim
- Cement patches in driveway, walkway, front-step




No comments: