Sunday, June 30, 2013

Flip House - Week Eleven

Week 11 was a busy week.  I took advantage of a day off of work for the 4th of July holiday to prep for family coming into town as well as got several hours of work in at the house.  We also got help from Mike's dad over the weekend so they were able to cross several things off the project plan this week.

Hardwood Floors Refinishing

Team Lipke

  • Caulked nail holes on trim in basement
  • Installed front door knob
  • Installed countertop brackets
  • Finished painting some of the staging furniture, headboard, kitchen table and chairs, and desk
  • Added rock to landscaping
  • Installed bathroom hardware 
  • Installed door casings and trim upstairs
  • Hung our flag outside
  • Painted garage door and touched up paint on the exterior
  • Finshed painting front door

Contractors
  • Installed countertop and sink
  • Installed kitchen faucet and capped pipe in laundry area
  • Installed carpet
  • Refinished hardwood floors
  • Installed cabinet crown

Sunday, June 23, 2013

Big Catch!

We took a couple days off from working on the flip house to head to Wisconsin this past weekend.  The boys enjoyed a day on the lake with Grandpa.  Between Evan, Mike, and Grandpa they only could have 2 poles going at once; they couldn't handle any more since they were getting so many bites.  Evan had a blast and did really well hooking the fish and reeling them in.  I see lots of fishing trips with the boys in the future for this little angler.



Flip House - Week Ten

Week 10 DONE!
  • Had sod put in where we pulled out rock beds
  • Painted the basement bedrooms closets
  • Started sanding down the hardwood floors
  • Trimmed out the entire basement including the door casings and floor trim
  • Cleaned (or attempted to clean) both bathtubs
  • Installed new front door threshold

Sunday, June 16, 2013

Flip House - Week Nine

The house is starting to look more like a house and we finally have running water in the bathrooms and working toilets!

From the project plan we completed:
  • Installed window casings
  • Grouted basement bathroom
  • Grouted entryways
  • Painted basement: finished painting bathroom, painted bedrooms
  • Painted upper level bath medicine cabinet
  • Painted inside of bi-fold doors and insides of closets in the upstairs bedrooms
  • Installed bathroom cabinet and mirror in basement bath
  • Cleaned out the gutters...this was another dirty job!
  • More landscaping clean-up including adding mulch to planting beds and seeding lawn where needed
This just about wraps up the work for the contractors besides the flooring, granite, and kitchen sink & faucet.  This week they were busy with:
  • Door hardware (knobs and stops) installed
  • Electrical inspection completed and passed
  • Range and refrigerator installed
  • Refrigerator water-line connected
  • Installed all of the bathroom plumbing (toilets, sinks, faucets, and shower/tub faucets)

Sunday, June 9, 2013

Flip House - Week Eight

Rounded out week 8 with several tasks crossed off the list.

Contractors: 
  • Electrical finishings: install all new outlets and switches as well as the light fixture
  • Installed the last of the interior doors (we left the bathroom doors until the tile was done) and the basement/garage entry door
  • Measured for carpet
  • Install oak in pantry closet
  • Window sashes replaced
  • Installed dishwasher
  • Bathroom vanity installed
The Lipke Team:  We ended up getting a babysitter on Sunday evening so we could both be at the house and get a bunch of things crossed off of the to-do list.
  • Touched up paint on interior doors
  • Finished tiling the bathroom showers
  • Grouted upstairs bathroom
  • Finished painting the basement family room
  • Installed the microwave
  • Installed the cabinet toe-kick
  • Nailed down the wood ledge pieces in the basement bedroom
  • Tiled the entries (by front door and also at the basement/garage entry)


Monday, June 3, 2013

Pre-K Graduation

The Graduate
It didn't take much to cry at Evan's Pre-K Graduation ceremony.  I started to read the program and the tears began to flow!  I was so proud of little boy and a bit sad that he is no longer the baby that I dropped off to this same daycare over 4 years ago.  After a couple of songs performed by the graduates they shared a photo memories slide show.  Then the teachers read the "Letter to Parents" and finally Evan was presented his diploma!  It's official...he is ready for kindergarten!

Evan had 11 children in his "graduating class" which included 7 other boys that were all in Evan's infant room with him. It has been so fun to see the boys grown into big boys!  Evan will not be joining any of his classmates at elementary school but they are bound to meet up again at middle school or high school.  Until then they are going to enjoy their last summer at Leaps & Bounds!






Dear Parents,

We give you back your child, the same child you confidently entrusted to our care. We give them back pounds heavier, inches taller, months wiser, more responsible, and more mature than they were then.

Although they would have attained their growth in spite of us, it has been our pleasure and privilege to watch their personality unfold day by day and marvel at this splendid miracle of development.

We give them back reluctantly, for having spent numerous months together in the narrow confines of a crowded classroom, we all have grown close, have become a part of each other, and we shall always retain a little of each other.

Ten years from now if we meet on the street, your child and I, a light will shine to our eyes, a smile to our lips, and we shall feel the bond of understanding once more, this bond we feel today.

We have lived, laughed, played, studied, learned, and enriched our lives together this year. We wish it could go on indefinitely, but give them back we must. Take care of them, for they are indeed precious.

Remember that we shall always be interested in your child and their destiny, wherever they go, whatever they do, whoever they become. Their joys and their sorrows we’ll be happy to share.

We shall always be their friend.

Sunday, June 2, 2013

Flip House - Week Seven




  • Tiled and grouted kitchen/dining room:  Evan managed to get his hands dirty with this project and helped out on this one.  After dinner and baths one night I brought the kids over to the house to check in on Dad.  Evan didn't hesitate to jump right into the action even if he was already in his pjs.  
  • Grouted upstairs bathroom
  • Mortared the bathroom showers seams
  • Painted inside of fireplace!  Finally done with the basement fireplace makeover with the exception of some minor touch-ups.
  • Painted basement family room
  • Kitchen appliances delivered
  • Dumpster picked up
  • Removal of washer, dryer, and dishwasher
  • Measured for the counter-tops but received bad news that they are about 4 weeks out for fabrication.  We were told it would be more like 2 weeks so I guess the house will be going on the market closer to July.
  • Completed some additional yard clean-up including burning all of the branches that we cut off of the large pine tree in the backyard.