Contractors:
- Electrical finishings: install all new outlets and switches as well as the light fixture
- Installed the last of the interior doors (we left the bathroom doors until the tile was done) and the basement/garage entry door
- Measured for carpet
- Install oak in pantry closet
- Window sashes replaced
- Installed dishwasher
- Bathroom vanity installed
- Touched up paint on interior doors
- Finished tiling the bathroom showers
- Grouted upstairs bathroom
- Finished painting the basement family room
- Installed the microwave
- Installed the cabinet toe-kick
- Nailed down the wood ledge pieces in the basement bedroom
- Tiled the entries (by front door and also at the basement/garage entry)