Flip House - Week Eight

Rounded out week 8 with several tasks crossed off the list.

Contractors: 
  • Electrical finishings: install all new outlets and switches as well as the light fixture
  • Installed the last of the interior doors (we left the bathroom doors until the tile was done) and the basement/garage entry door
  • Measured for carpet
  • Install oak in pantry closet
  • Window sashes replaced
  • Installed dishwasher
  • Bathroom vanity installed
The Lipke Team:  We ended up getting a babysitter on Sunday evening so we could both be at the house and get a bunch of things crossed off of the to-do list.
  • Touched up paint on interior doors
  • Finished tiling the bathroom showers
  • Grouted upstairs bathroom
  • Finished painting the basement family room
  • Installed the microwave
  • Installed the cabinet toe-kick
  • Nailed down the wood ledge pieces in the basement bedroom
  • Tiled the entries (by front door and also at the basement/garage entry)