Friday was Evan's last day as a Pre-K student at his daycare. He said his "see ya laters" to all of his friends and teachers. Even though he won't be in class anymore he will still get to see everyone almost daily when he picks up his little sister everyday.
Saturday, August 24, 2013
Monday, August 12, 2013
Lemonade for Lilah
Evan and Emma spent most of Saturday working the garage sale crowd to bring in some serious cookie and lemonade sales! They were selling cookies and drinks for their schoolmate, Lilah, who was just recently diagnosed with cancer. Lilah and her family have been on our minds and hearts every since we heard the news. Our daycare is planning some fundraising and their overall goal is collect enough money so her family can purchase a play-set for Lilah. They thought this would be something they could set up in their basement while she is being treated, as she will most likely have a great deal of time where she will not be able to leave the house. We thought a lemonade stand was a perfect opportunity for the Lipke kids to help collect donations. Thanks to the generosity of friends, family, neighbors, and complete strangers the kids were able to raise over $200! Evan was an awesome salesman and made it pretty difficult for people to say no. Rather than ask them if they wanted to buy cookies he just asked them if they wanted chocolate chip or sugar cookies. He had his whole pitch down-pat including being very polite and saying "Thank you and have a nice day!" Emma wasn't as into the sales as much. Mostly she just looked cute and helped herself to our cookie inventory and let big brother handle the business.
Tuesday, July 30, 2013
Countdown to Kindergarten
Everyday and often multiple times a day Evan asks when he is going to kindergarten. However he still doesn't have a good grasp on time so if I tell him over a month he still thinks he only has to go to daycare for 3 more days. To help him understand how much longer he has until he starts elementary school we created a little paper chain countdown at the house. Everyday he rips off a new link in the chain to countdown the days. Excited doesn't even come close to describing how Evan feels about starting school! The downfall to this however is Emma now wants to go to kindergarten too. I told her she needs to turn 5 first and that she is only 2. She said, "Okay, I'll wait my turn." However I have a feeling this is not the last conversation we will have with Emma on this subject.
Sunday, July 21, 2013
Brother and Sister
Many times Evan and Emma are into different things or are fighting over the same toy rather than actually planning with each other. I love the moments when they actually play TOGETHER! I hope as they get older we have more of these kind of memories.
Wednesday, July 17, 2013
School Shopping
Even though Evan doesn't start kindergarten until September 3rd I got a head start on the school supply shopping. If you know me, I am a planner, and when it comes to any required purchases, I get those done well in advance of when we really need to. I also loved shopping for school supplies as a kid so I wasn't wasting any time getting Evan's gear. However, school shopping has definitely changed a lot from when I was a kid. I used to love picking out all of the different color folders and notebooks and who could forget the Trapper Keeper and the fancy multi-colored push up pens! Evan's list is very specific down the the color and material of the folders. I was able to pick up everything at Target with the exception of the the 4 blue dry erase markers that I found at target.com. Some of the stuff on the list is questionable. Will he really go through 72 crayons and 6 glue sticks?!? Next year, I am sure I will opt for the supplies-in-a-box plan where you can just pay $20 or so and get all of the required supplies shipped directly to the school. It really wasn't as exciting as it used to be. I get that the schools have a reason for the detailed lists but they really sucked some of the fun out of school shopping. We'll try to still make it fun and see what other stuff we can find to add to what he needs. I plan on taking Evan shopping so he can at least buy a few things where he can actually pick it out. Hopefully we will score at least a couple superhero themed supplies that he'll love.
Evan's 2013-2014 Kindergarten Plus Supply List
3 - 24 ct Crayola Crayons
1 - Yellow Plastic 2-Pocket Folder w/o Clasps
1 -Red 2-Pocket Paper Folder w/o Clasps
1 - 5" Blunt Scissors
1 - 8 ct Conical Tip Washable Markers, Classical Color
1 -Blue 2-Pocket Paper Folder w/o Clasps
6 - Large Washable Glue Sticks, Purple
1 -Red Spiral Notebook 1 Subject Wide Rule 70 ct
1 -Black Ultra Fine Flair Pen (no sharpies)
4 -Blue Dry Erase Markers Chisel Tip, Low Odor
PLEASE INCLUDE ONE OF THE FOLLOWING: Gallon Size Sealable Storage/Freezer Bags 15 ct, Sandwich Storage Bags 50 ct, Napkins
Standard Package, 200 ct Facial Tissues, 80 ct Unscented Tub of Wipes (Fragrance & Alcohol Free)
Evan's 2013-2014 Kindergarten Plus Supply List
3 - 24 ct Crayola Crayons
1 - Yellow Plastic 2-Pocket Folder w/o Clasps
1 -Red 2-Pocket Paper Folder w/o Clasps
1 - 5" Blunt Scissors
1 - 8 ct Conical Tip Washable Markers, Classical Color
1 -Blue 2-Pocket Paper Folder w/o Clasps
6 - Large Washable Glue Sticks, Purple
1 -Red Spiral Notebook 1 Subject Wide Rule 70 ct
1 -Black Ultra Fine Flair Pen (no sharpies)
4 -Blue Dry Erase Markers Chisel Tip, Low Odor
PLEASE INCLUDE ONE OF THE FOLLOWING: Gallon Size Sealable Storage/Freezer Bags 15 ct, Sandwich Storage Bags 50 ct, Napkins
Standard Package, 200 ct Facial Tissues, 80 ct Unscented Tub of Wipes (Fragrance & Alcohol Free)
Monday, July 15, 2013
Promotions
With Emma's move to the preschool room there will be a slightly more structured day with teacher directed activities as opposed to more child chosen activities. She will ditch any sort of sippy cup though she has already mastered the "big girl cup" so she is more than ready for this. Emma will now participate in Stretch and Grow which is a youth fitness program as well as Show & Tell days. Another exciting change that comes withe preschool room is that on some days in the early mornings and evenings the preschool class combines with the Pre-K class so she'll get to be in the same classroom as her big brother for the next couple months before he starts kindergarten. We will use this classroom change to drive more focused potty-training so we hope to have some developments in this area to report in the next few months.
Emma's first official full day in the preschool class is next Monday and we are excited to see her continue to grow and learn!
Sunday, July 14, 2013
Flip House - Weeks 12-13
We didn't put a lot of time into the house during week 12 as we had family in town and we went back to the Wisconsin for the 4th of July. However the days that we were in MN we managed to put my parents to work. Thanks mom and dad!
Things that we were able to accomplish in the couple days of week 12 and throughout week 13:
Cleaned and painted the utility room brick
Caulked nail holes upstairs in all of the trim/casings
Finished painting the entryway walls/ceiling edge where we needed the super tall ladder
Patched some grout work and grouted the space between the kitche/dining tile and hardwood
Caulked bath tubs
Installed cabinet legs for bathroom vanity
Painted deck and front step with a restoration paint product
Installed closet shelves, still need to get the basement bedroom one done
Installed stair railings
Cleaned entire house and touched up paint throughout
Brought furniture to the house and staged family room, kitchen/dining, bathrooms, master bedroom, kids room, and basement bedroom (as an office)
Professional photos taken
House listed on Friday 3-12-13! A little shy of 90 days from when we got the keys to the house.
Pulled weeds to finish clean-up of all of the many plant beds and added more rock
![]() |
| Before |
![]() |
| After |
It's just about a wrap! Our blood, sweat and even a few tears have went into this project. We are happy to be done but are looking forward to the next one. There are a few little things we still have to take care of but we are "show" ready. Bring on the buyers! Some additional BEFORE and AFTER photos are posted here.
Saturday, July 6, 2013
Fishy Four
If we are in Wisconsin for the 4th of July we run the fishy-four. This year Emma joined us and I opted to walk. It was a great way to start the day!
Friday, July 5, 2013
Gone Fishing!
While in Wisconsin the boys got in plenty of fishing. I got into the action one day and got the award for the smallest fish caught. Literally my fish looked like it could have been bait but unfortunately I didn't capture the little guy on camera.
Thursday, July 4, 2013
Pre-fireworks Festivities
Waiting for the sun to go down the kids kept busy with bubbles, sidewalk chalk, wiffle ball, and Evan entertained everyone with his singing and dancing! Of course he was singing one of his favorite songs, "Firework" and also broke into a little "Call me Maybe". Instead of traveling to see the city fireworks we had a DIY show in the front yard and the kids loved it.
Parade Time on the 4th of July
The parade was a bit disappointing...too long of gaps between the "floats" and lack of candy for the kids but that really didn't phase Evan. He was all about it. Emma held down her stroller for the first part and after relaxing in the shade we was done spectating, ready to get in on the action and take her try at catching eating candy.
Tuesday, July 2, 2013
Take Me Out to the Ballgame
After a long day at the pool all of the "big kids" headed to the Twins vs. Yankees game. Evan passed out on the way downtown which made for brutal exit from the car including crying, dragging, and literally pulling him out of the car. However, all was made good when he ordered popcorn before he even sat down at the ballpark. As soon as he got his box of popcorn he held it up in the air like it was a trophy with a huge smile on his face. He was then ready to rock and officially made it several more innings than he has ever before. I am sure it helped that he also enjoyed a baseball cap ice cream sundae and his cousins where there to entertain him.
Sunday, June 30, 2013
Flip House - Week Eleven
Week 11 was a busy week. I took advantage of a day off of work for the 4th of July holiday to prep for family coming into town as well as got several hours of work in at the house. We also got help from Mike's dad over the weekend so they were able to cross several things off the project plan this week.
Team Lipke
Contractors
| Hardwood Floors Refinishing |
Team Lipke
- Caulked nail holes on trim in basement
- Installed front door knob
- Installed countertop brackets
- Finished painting some of the staging furniture, headboard, kitchen table and chairs, and desk
- Added rock to landscaping
- Installed bathroom hardware
- Installed door casings and trim upstairs
- Hung our flag outside
- Painted garage door and touched up paint on the exterior
- Finshed painting front door
Contractors
- Installed countertop and sink
- Installed kitchen faucet and capped pipe in laundry area
- Installed carpet
- Refinished hardwood floors
- Installed cabinet crown
Sunday, June 23, 2013
Big Catch!
We took a couple days off from working on the flip house to head to Wisconsin this past weekend. The boys enjoyed a day on the lake with Grandpa. Between Evan, Mike, and Grandpa they only could have 2 poles going at once; they couldn't handle any more since they were getting so many bites. Evan had a blast and did really well hooking the fish and reeling them in. I see lots of fishing trips with the boys in the future for this little angler.
Flip House - Week Ten
Week 10 DONE!
- Had sod put in where we pulled out rock beds
- Painted the basement bedrooms closets
- Started sanding down the hardwood floors
- Trimmed out the entire basement including the door casings and floor trim
- Cleaned (or attempted to clean) both bathtubs
- Installed new front door threshold
Sunday, June 16, 2013
Flip House - Week Nine
The house is starting to look more like a house and we finally have running water in the bathrooms and working toilets!
From the project plan we completed:
- Installed window casings
- Grouted basement bathroom
- Grouted entryways
- Painted basement: finished painting bathroom, painted bedrooms
- Painted upper level bath medicine cabinet
- Painted inside of bi-fold doors and insides of closets in the upstairs bedrooms
- Installed bathroom cabinet and mirror in basement bath
- Cleaned out the gutters...this was another dirty job!
- More landscaping clean-up including adding mulch to planting beds and seeding lawn where needed
This just about wraps up the work for the contractors besides the flooring, granite, and kitchen sink & faucet. This week they were busy with:
- Door hardware (knobs and stops) installed
- Electrical inspection completed and passed
- Range and refrigerator installed
- Refrigerator water-line connected
- Installed all of the bathroom plumbing (toilets, sinks, faucets, and shower/tub faucets)
Sunday, June 9, 2013
Flip House - Week Eight
Rounded out week 8 with several tasks crossed off the list.
Contractors:
Contractors:
- Electrical finishings: install all new outlets and switches as well as the light fixture
- Installed the last of the interior doors (we left the bathroom doors until the tile was done) and the basement/garage entry door
- Measured for carpet
- Install oak in pantry closet
- Window sashes replaced
- Installed dishwasher
- Bathroom vanity installed
- Touched up paint on interior doors
- Finished tiling the bathroom showers
- Grouted upstairs bathroom
- Finished painting the basement family room
- Installed the microwave
- Installed the cabinet toe-kick
- Nailed down the wood ledge pieces in the basement bedroom
- Tiled the entries (by front door and also at the basement/garage entry)
Monday, June 3, 2013
Pre-K Graduation
| The Graduate |
Evan had 11 children in his "graduating class" which included 7 other boys that were all in Evan's infant room with him. It has been so fun to see the boys grown into big boys! Evan will not be joining any of his classmates at elementary school but they are bound to meet up again at middle school or high school. Until then they are going to enjoy their last summer at Leaps & Bounds!
Dear Parents,
We give you back your child, the same child you confidently entrusted to our care. We give them back pounds heavier, inches taller, months wiser, more responsible, and more mature than they were then.
Although they would have attained their growth in spite of us, it has been our pleasure and privilege to watch their personality unfold day by day and marvel at this splendid miracle of development.
We give them back reluctantly, for having spent numerous months together in the narrow confines of a crowded classroom, we all have grown close, have become a part of each other, and we shall always retain a little of each other.
Ten years from now if we meet on the street, your child and I, a light will shine to our eyes, a smile to our lips, and we shall feel the bond of understanding once more, this bond we feel today.
We have lived, laughed, played, studied, learned, and enriched our lives together this year. We wish it could go on indefinitely, but give them back we must. Take care of them, for they are indeed precious.
Remember that we shall always be interested in your child and their destiny, wherever they go, whatever they do, whoever they become. Their joys and their sorrows we’ll be happy to share.
We shall always be their friend.
Sunday, June 2, 2013
Flip House - Week Seven
- Tiled and grouted kitchen/dining room: Evan managed to get his hands dirty with this project and helped out on this one. After dinner and baths one night I brought the kids over to the house to check in on Dad. Evan didn't hesitate to jump right into the action even if he was already in his pjs.
- Grouted upstairs bathroom
- Mortared the bathroom showers seams
- Painted inside of fireplace! Finally done with the basement fireplace makeover with the exception of some minor touch-ups.
- Painted basement family room
- Kitchen appliances delivered
- Dumpster picked up
- Removal of washer, dryer, and dishwasher
- Measured for the counter-tops but received bad news that they are about 4 weeks out for fabrication. We were told it would be more like 2 weeks so I guess the house will be going on the market closer to July.
- Completed some additional yard clean-up including burning all of the branches that we cut off of the large pine tree in the backyard.
Sunday, May 26, 2013
Flip House - Week Six
This week was an existing to see the house start to come together and with an end in sight. Some of the tasks crossed off the list during week 6 include:
- Filled up dumpster to clear out everything in the house
- Filled up dumpster to clear out everything in the house
- Windows installed (by Pella)
- Demo'ed the basement garage entry door
- Contractor installed most of interior doors (holding off on the bathroom doors so we can finish the tile and still waiting on the delivery of the garage entry door)
- Mowed the lawn for the first time, cleaned-up some of the landscaping in the back
- Painted and installed the shutters- Installed our $30 craigslist mantel
- Finished painting ceilings in basement
- Primed walls
- Painted entire upstairs with the exception of the family room
- Painted fireplace
- Cabinets installed
- Scheduled carpet measurement
- Tiled floors in both bathrooms
- Hung house numbers
- Repaired garage door trim
- Cement patches in driveway, walkway, front-step
- Painted and installed the shutters- Installed our $30 craigslist mantel
- Finished painting ceilings in basement
- Primed walls
- Painted entire upstairs with the exception of the family room
- Painted fireplace
- Cabinets installed
- Scheduled carpet measurement
- Tiled floors in both bathrooms
- Hung house numbers
- Repaired garage door trim
- Cement patches in driveway, walkway, front-step
Sunday, May 19, 2013
Flip House - Week Five
- Landscaping: We started tackling the crazy landscaping that the previous owner created. We trimmed big pine tree and racked up the leaves, cleaned up most of the front planting beds, removed a planting bed along road, created boulder edging along front planting bed and about half of the time we were doing this in the rain. I wish I would have got a picture of us. Not only were we full of mud and soaking wet but Mike also managed to rip his jeans from the crotch to about his knee. I am sure we were a sight to see.
- Power-washed the exterior
- Filled seams in exterior where windows were removed
- Scheduled cabinet delivery
- Scheduled granite measurement
- Finished cleaning off any excess wall-paper glue on the master bedroom walls
- Purchased additional painting supplies, tiles, and misc. items such as a door bell and closet door knobs
- Contractor completed all of the drywall work including spraying texture on the ceilings
- Painted entire upstairs ceilings and started the basement
- Primed walls in kitchen and family room
- Ordered our final dumpster
- Finished priming the basement fireplace...this was another long process and there is a lot left to do. A never-ending project like the closet doors.
Saturday, May 18, 2013
Emma's First Dental Check-up
Monday, May 13, 2013
Flip House - Week Four
![]() |
- All preliminary inspections complete & passed
- Drywall hung
- Initial landscaping clean-up complete
- Cleaned up and painted the heat registers and return grills
- Removed shutters, will paint them black and only put them back on the upper windows
- Caulked and painted exterior board-and-baton siding
- Added insulation in basement ceiling
- Finished painting existing window trim
- Emptied out the utility room (washer & dryer, utility sink, pressure pump)
- Continued to put a couple coats of paint on the existing bi-fold closet doors...this is taking forever! Each side needs to be primed and then two coats of paint. Hopefully will have this complete next week.
- Cut out hardwood flooring in kitchen where tile will start
- Marked all of the doors so the contractor knows which one goes whereChanged the dates for the kitchen appliance delivery due to the cabinets being delayed
![]() |
| Top - kitchen and family room - BEFORE Bottom - Looking into the kitchen and family room - IN PROCESS |
![]() |
| Left - Upper level bathroom- BEFORE Right - Upper level bathroom - IN PROCESS |
Tuesday, May 7, 2013
Kindergarten Round-Up
Monday, May 6, 2013
Flip House - Week Three
Another week in the books completed at the house on Walnut.
This week we ran into a road-block with inspections. We called, went to the city building department, and reviewed the guidelines online to determine what permits we needed. Our contractors pulled permits for the electrical, plumbing, and the furnace replacement however when the plumbing inspector arrived he determined that we needed another permit and placed a stop work order on our door. This set us back a couple days. The city was very nice about everything and said that the work we are doing is really borderline in terms of needing additional permits. Each room individually would not need another permit but when you look at the full scope of work in the house they said we needed a permit for the remodel. This will also require a framing inspection and an insulation inspection as well. We want to do everything by the book so we have no problem with this. We should be good to go to start work Monday morning. Even though our contractors didn't work Thursday and Friday we were still busy all week and weekend.
- Plumbing and electrical inspections
- Prepped the demo walls for new drywall (i.e. pull out all of the nails and screws left behind from the demo)
- Primed the basement fireplace
- Painted bi-fold closet doors
- Sanded, primed, and painted existing windows trim
- Put all of the doors back on jams (removed everything to paint last week)
- Removed all of the thinset left on the basement bathroom floor and entry way
- Purchased additional materials including the closet shelving
- Had another dumpster bag picked up
- Removed all existing hardware, shelves, rods, etc. in the closets
- Accessed yard work needed and contacted a few companies for bids to do the initial yard clean-up
Monday, April 29, 2013
Bath-time
For the 4 days of Spring that we have had so far we have realized that baths have to be a daily routine due to all of the sunscreen, sand, sweat, and dirt the kids collect throughout the day. Emma knows as soon as dinner is over it is "bath-time." She sings "bath-time, bath-time, B-A-T-H time" as she heads ups the stairs.